This Commonwealth Medical College was a 3-story 185,000 square foot structure, in which our scope of work included rebar caissons, rebar mats and installation of wire mesh. From laying out the bundles of 60 foot rebar to organizing the caisson construction, with limited lay down area, we successfully planned the job and systematically installed it to meet Quandel’s rebar schedule.
Penn State Pegula Ice Arena
While people know Penn State football, they were not known for their hockey as much. That is about to change.
This rebar project included rebar walls, footings, columns and more. Rebar had to be installed in conjunction with complex conduit layout and many other challenges. Each rebar bend was checked for correct tolerance (and yes we do mean EVERY bend). But at the end of the day, this 228,000 S. F. arena got built just like all the other projects. One successfully implemented plan at a time.